Impact Fee Process
Impact Fee Process for Builders and Developers
Impact fees apply to qualifying new development within the Black Forest Fire/Rescue Protection District. Builders and developers cannot calculate or pay the fee before a building permit has been issued. Black Forest Fire Rescue calculates each fee using the applicable square footage and the District’s adopted impact fee schedule.
Step 1: Apply for Your Building Permit
Submit your project and building permit application through the Pikes Peak Regional Building Department.
Black Forest Fire Rescue does not issue building permits.
Step 2: Receive Your Building Permit
Pikes Peak Regional Building Department must issue the building permit before Black Forest Fire Rescue can collect the impact fee.
This timing is required by C.R.S. § 32-1-1002(1)(d.5)(VI), which states that a fire protection district may not collect an impact fee before the approving local government issues the building permit.
Step 3: Project Information Is Provided to BFFR
After the permit is issued, Pikes Peak Regional Building Department provides Black Forest Fire Rescue with the information needed to assess the impact fee, including:
- Building permit number
- Project address
- Type of development
- Applicable square footage
- Applicant or developer contact information
Please make sure the contact information associated with your permit is accurate.
Step 4: BFFR Calculates the Impact Fee
Black Forest Fire Rescue applies the District’s adopted impact fee schedule to the applicable square footage provided by the Building Department.
Builders, developers, and property owners cannot determine the final impact fee themselves. BFFR must complete the official calculation.
Step 5: BFFR Sends an Invoice
Once the fee has been calculated, BFFR will email an individual QuickBooks invoice to the applicant or developer listed for the project.
The invoice will include:
- Building permit number
- Project information
- Impact fee amount
- Applicable statutory and District resolution information
- Secure online payment options
Because every fee must be connected to a specific project and permit, BFFR does not use a general impact-fee payment link.
Step 6: Pay the Impact Fee
Select Pay now on the invoice to pay by:
- Bank transfer
- Credit card
Bank transfers do not include a customer fee. Any applicable credit card surcharge will be shown before payment is completed.
Step 7: Receive Payment Confirmation
After the payment has been received and processed, BFFR will provide a paid receipt or written confirmation that the impact fee associated with the permit has been satisfied.
Please keep this confirmation with your project and permit records.
Step 8: Begin Construction
Once the impact fee has been paid and you have received confirmation from Black Forest Fire Rescue, you may begin construction, provided all other permit requirements, approvals, and conditions established by Pikes Peak Regional Building Department have been satisfied.
Have You Received Your Permit but Not an Invoice?
If your building permit has been issued but you have not received an impact fee invoice, first contact the Pikes Peak Regional Building Department at 719-327-2880 to confirm that your permit and project information have been provided to Black Forest Fire Rescue.
If Pikes Peak Regional Building Department confirms that the information was sent, contact Black Forest Fire Rescue at admin@bffire.org or 719-495-4300.
Please have your building permit number, project address, and applicant or developer contact information available.
Applicants shall demonstrate full compliance and conformance with El Paso County’s adopted Land Development Code (LDC), Engineering Criteria Manual (ECM), adopted International Fire Code (IFC), and all other adopted codes, provisions, or statutes that impact fire safety to include access/egress, water supply, hardening of structures, addressing, fire protection systems, etc. The applicant shall submit a comprehensive fire protection report from a qualified fire protection engineer that is licensed as a Professional Engineer (PE) by the Colorado State Board of Registration for Professional Engineers to demonstrate conformance to all requirements. Furthermore, the District does not support any waivers or variances that negatively impact any fire safety provisions including access/egress, water supply, hardening of structures, addressing, fire protections systems, etc.”
Black Forest Fire Rescue has developed this guide to help you with planning your development project. It provides you with the requirements that must be met for your project to comply with the BFFRPD standards. This guide includes essential information about water and cisterns that must be incorporated into your plan to ensure the safety of your property and the surrounding community.
Cistern and Dry-Hydrant Specifications .pdf
Please Note:
Black Forest Fire Rescue does not provide advice or assistance regarding the actual construction of cisterns. Our role is primarily focused on ensuring that developers are aware of the correct pipe connection specifications.
Typically, developers choose to purchase pre-made cisterns and engage excavators to dig the hole. Licensed plumbers are then responsible for installing the necessary piping. Once these steps are completed, the hole is backfilled before our team arrives to conduct an operational check.
It is essential to understand that cisterns are owned and maintained by the property owner(s) themselves. As a helpful tip, we advise property owners to ensure that their cistern systems are designed to retain water indefinitely and maintain a vacuum seal over time. This is crucial for the effective operation of the cistern and its readiness for any potential firefighting needs.
Black Forest Fire Rescue Protection District works directly with Colorado Springs Fire Department for all commercial building plans review and inspections. Visit Colorado Springs Fire Department Website for more information
This will give initial guidance for what will be required.
Black Forest will also follow NFPA 1142 (2015) Water supply for Rural Firefighting which will give guidance if building in an area with no distributed water supply.
What Is the Colorado Wildfire Resiliency Code?
- The CWRC is a state-adopted minimum standard designed to help reduce wildfire risk to homes, businesses, and communities.
- It focuses on wildland-urban interface (WUI) construction, requiring fire-resistant materials, defensible space, and safe access.
Ground-Truthing.
- Verifying state-provided wildfire risk maps on the ground, using real-world conditions and local expertise.
- Working with Statewide fire protection districts, planning officials, and emergency services.
- Ensure the code is applied fairly and accurately, based on actual fuels, slope, access, and local fire behavior.
How This Affects You.
- If you’re not building, remodeling, or developing land in a high-risk wildfire area, this code does not apply to you.
- If you plan to build in a WUI zone, you may need to follow basic wildfire safety construction practices, such as:
- Fire-resistant roofing and siding
- Creating defensible space (clearing flammable vegetation around structures)
- Ensuring your driveway or road can support fire truck access
Our Unified Message as Fire Districts
- All fire protection districts in El Paso County are working together to support the County’s and States efforts.
- We are committed to:
- Public transparency throughout the process
- Fair and reasonable application of the Code
- Protecting residents, their homes, and our responders from future wildfire threats
The CWRC gives us tools, but local application will be based on common sense and local conditions.